Volume 12, Issue 44 (7-2021)                   jemr 2021, 12(44): 213-247 | Back to browse issues page


XML Persian Abstract Print


Download citation:
BibTeX | RIS | EndNote | Medlars | ProCite | Reference Manager | RefWorks
Send citation to:

Kazemi S, Hortamani A, Fadaei M. Explain the optimal pattern in the contracts of public private Participation construction, exploitation and transfer (BOT) Applied to Contracts Theory. jemr 2021; 12 (44) :213-247
URL: http://jemr.khu.ac.ir/article-1-2189-en.html
1- Islamic Azad University, Dehaghan Branch
2- Islamic Azad University, Dehaghan Branch , amirhortamani@dehaghan.ac.ir
3- Payam Noor University, Isfahan Branch
Abstract:   (3213 Views)
In recent decade in developing countries, lack of government budget or lack of access to modern technology, persuade governments to attract private sector participation in the economy. One of the most common methods is Public-Private Partnership agreements. The real implementation of this type of partnership needs to set contracts that satisfies preferences of both parties. This research aims to solve this problem using the solutions available in the Contracts Therory Knowledge. Theoretical modeling with analyzing public-private partnership model, provide an optimal model for BOT contract. We use library method to explain the basic contract and mathematical modeling  by MATLAB software with Particle Swarm Optimization to specify the parameters of utility functions and to provide optimal contract. 
The simulation results for an optimal contract were calculated using the supposed parameters (life time, incom, costs, future incoms discount rate, salvage value of project costs) 38 years (project utilization time), 78% (principal participation after transfer time), 45% (principal participation during the operation), 7% (riskes to the principal).
The results showed that  these parameters are fully matched with the theoretical properties of the model and the principals utility is maximum beside the agent participation.
Full-Text [PDF 1917 kb]   (2062 Downloads)    
Type of Study: Applicable | Subject: سایر
Received: 2021/06/18 | Accepted: 2021/11/16 | Published: 2022/01/25

References
1. Abbasi, A., Ramezanian, E. (2015). Identify and Assess Financial Risk Management Approach Using BOT Projects HP-DEA, Financial Knowladge of Securities Analysis, 8 (25), 69-79. (in Persian)
2. Abbaszadeh, E., Parchami Jalal, M & Raqimi, A. (2017). A Decision-Making Model to Attract Private Sector Investors into BOT and BOO Water and Sanitation Projects. Journal of Water and Wastewater, 28(1), 1-17. (in Persian)
3. Asharion Qomizadeh, F., Tajmir Riahi, H. (2014). Comparing Financing Methods in Energy Projects Based on Istisna Sukuk - BLT Contract and Independent Istisna Sukuk Annexation. Islamic Finance Research Bi-quarterly Journal, 3 (2), 159-186. (in Persian)
4. Azar, A., Gholipour, R., Alvani, M., Komijani, A., & Mohammadi, E. (2011). Designing of Comprehensive Model Privatization and Transfer of State owned Enterprises With policymaking Approach In Iran. Management Research in Iran, 15 (4), 29-49. (in Persian)
5. Bahrololoum, M., Bakhtiar, Sh. (2020). Comparative Analysis of Financing Methods in Thermal Power Plants in Iran. Journal of Energy Policy and Planning Research, 6 (3), 221-250. (in Persian)
6. Bia,W., & Zhang, L.)2020(. How to finance for establishing hydrogen refueling stations in china? An analysis based on Fuzzy AHP and PROMETHEE. International journal of Hydrogen Energy,45(59),34354-34370 [DOI:10.1016/j.ijhydene.2019.12.198]
7. Chiappori, P. A., & Salanie B. (1997). Empirical Contract Theory: The Case of Insurance Data. European Economic Review, (4), 943-950. [DOI:10.1016/S0014-2921(97)00052-4]
8. Clerc, M. (2006). Particle Swarm Optimizition. The International Scientific Series [DOI:10.1002/9780470612163]
9. Country Plan and Budget (2020). Public-Private Partnership Program of the Government in 1400. Tehran: Publications of the National Planning and Budget Organization, Documentation Center. (in -Persian
10. Davodian, H., Akbari Lor, H., Alvand, R., Seyed Kalbadi, M.(2016). Evaluation of the performance of BOT contracts in the development of construction and development of infrastructure. International Conference of Management Elites, Tehran, https://civilica.com/doc/528847. (in Persian)
11. Emamian, S., Jalali, Gh. And Shahnaghi, K. (2017). New Model of B.o.t Contracts To Determine Concession Period and Transfer Point for Building Power Plants. Iranian Electric Industry Journal of Quality and Productivity, 5(2), 41-50. (in Persian)
12. Fouzul khan, M., & J.parra, R. (2003). financing large project, prentise hall.
13. Derakhshan, Morteza (2016). Theory of Contracts, Motives and Information, First Edition, Tehran: Imam Sadegh University Press. (in Persian)
14. Golabchi, M., & Noorzaei, E. (2015). Selection of Proper Method of Public-Private Partnership to Finance Iran Freeway Projects with AHP Approach. JOURNAL OF TRANSPORTION ENGINEERIN, 6 (3), 523-537. (in Persian)
15. Hart, O. (2003). Incomplete contracts and public ownership: Remarks, and an application to public-private partnershipps. The Economic Journal Conference Papers, 113(486), 69- 76. [DOI:10.1111/1468-0297.00119]
16. Haghighat, j., Purpartovi, M. (2015). An Economic Analysis Of Different Methods Of Financing Tehran Strategic Oil Storage. Journal Of Iranian Energy Economics, 2(6), 49-73.
17. Hashimoto, H., Hamada, k. & Hosoe, N. (2010). A numerical approach to the contract theory: the case of adverse selection. GRIPS Policy Research Center, Discussion 11-27.
18. Hosseini, S. M., &, Davodian, A. (2011). Prioritization of financing methods for refinery projects in Iran, Financial Management Perspective, 1(3), 69-82. (in Persian)
19. -Iyer, K.C. & Sagheer, M. (2010), Hierarchical structuring of PPP risks using interpretative structural modeling. Construction engineering management, 136(2),151-159. [DOI:10.1061/(ASCE)CO.1943-7862.0000127]
20. o -Kashfi, H., & Raghimi, A. (2014). Benefiting from private sector capacities in forms of BOO and BOT mechanisms . Journal of Water and Sustainable Development, 1 (1), 1-7 .(in Persian)
21. -Khazaeni, G., Khanzadi, M., & Afshar, A. (2011). Deal Success Evaluation Of Multi Objective Model For Bot Projects; Structure And RNapplication. [DOI:10.7603/s40354-012-0019-0]
22. Sharif JOURNAL Civil Engineering, 2 (2), 45-55. (in Persian)
23. Meshkat, M. (2020). Public-Private Partnership (PPP) BOT, EPC, HAM contract models.
24. Tehran: Mizan Publishing. (in Persian)
25. Moalemi, M., & Zahedi, M. (2011). Evaluation of economic plans. Tehran: Payame Noor University Press. (in Persian)
26. Momeni, M.( 2017). New Topics in Operations Research. Author Publisher. (in Persian)
27. Moszoro, M., Krzyzanowska, M. (2011). Implementing Public-Private Partnerships in Municipalities. Working Paper, WP-908, In: IESE Research Papers. [DOI:10.2139/ssrn.1679995]
28. Nikbakhsh, Ali.(2015). Review of international contracts for construction, operation and transfer. Third International Conference on New Approaches to Energy Conservation
29. Nosrati, m., Sadeghi, H., Abdoli, Gh., & Agheli, L. (2013). Applying Public-Private Partnership Investment Model in Health: Assessment of Hospital Readiness in Iran. Journal of Management And Medical Informatics School, 1 (2), 128-137. (in Persian)
30. Pollitt, C., & Bouckaert G. (2004). Public management reform. A comparative analysis. Oxford University Press USA.
31. Pratap, k. V., & R. Chakrabarti. (2018). Public- private partnerships in Infrastructure. Managing the challenges, springer Singapore. [DOI:10.1007/978-981-10-3355-1_2]
32. Toghyani, M, Samadi, S, Sadeghi, Z. (2015).An Analysis of the Problem of Asymmetric Information in Partnership Contracts of Interest- Free Banking and the Solutions. Ma'rifat-e Eghtesad-e Islami, 7 (13), 5-34. (in Persian)
33. Vosoughi, V., & Vosoughi, P. (2017). Study and Recognition of BOT Partnership Contract in Water and Wastewater Infrastructure Projects, National Conference on Engineering Sciences, Tehran, https://civilica.com/doc/655883. (in Persian)
34. Ye, S. & Tiong., R. (2003). ‌The Effect Of Concession Period Design On Completion Risk Management Of BOT Projects. Construction Management and Economics, 21(5), 471-482. [DOI:10.1080/0144619032000073488]
35. Yuan, J., Wang, C., Skibniewski, M. J., & Li, Q. (2012). Developing key performance indicators for Public- private partnership projects: Questionnaire survey and analysis. Journal of Management in Engineering, 28(3), 252-264. [DOI:10.1061/(ASCE)ME.1943-5479.0000113]
36. Yumurtaci, Z., Erdem, H. (2007). Economical analyses of build- 0perate- transfer model in establishing alternative power plants. Energy conversion and Management, 48(1), 234-241. [DOI:10.1016/j.enconman.2006.04.009]

Add your comments about this article : Your username or Email:
CAPTCHA

Send email to the article author


Rights and permissions
Creative Commons License This work is licensed under a Creative Commons Attribution-NonCommercial 4.0 International License.

© 2024 CC BY-NC 4.0 | Journal of Economic Modeling Research

Designed & Developed by : Yektaweb